Access point placement
Access points positioned from survey data, not spread evenly and hoped for. Channel and power settings tuned so they stop fighting each other.
IT Projects
A dead spot by the till or a dropped call costs you an enquiry every time it happens, and downtime during trading costs you the sale. We survey the building before quoting, run proper cable, and cut over out of hours so Monday morning simply works.
What this protects
Network work done badly is paid for twice: once now, and again in complaints. Done properly, it disappears into the background where it belongs.
Cutovers run after close and before open, so you lose a Saturday rather than a Tuesday afternoon of trading.
Coverage where the work happens keeps tills, calls and cloud systems moving instead of stalling.
Cabling tested, labelled and mapped, so nobody has to trace a mystery run through the cabinet a second time.
Most Wi-Fi complaints turn out to be coverage and cabling problems, not router problems. So the first visit is a walk round with a survey tool, not a sales call. We map signal, count devices per area, find the walls doing the damage and check whether the existing cabling will actually carry the load.
Only then do we quote. That means the price you get is for the job your building needs, rather than for a box of access points and an optimistic afternoon.
Access points positioned from survey data, not spread evenly and hoped for. Channel and power settings tuned so they stop fighting each other.
New runs pulled, tested and certified, with patch panels, labelling and a diagram you can hand to the next engineer.
Power-over-Ethernet switching sized for the access points and phones, in a cabinet that is tidy enough to work in.
Guest traffic on its own network with its own rules, kept well away from the machines holding your data.
Signal tests in the areas that matter, speed checks at the desk, and a short handover covering what changed.
Switchover done when the building is empty, so you spend a Saturday rather than lose a Tuesday afternoon of trading.
We work to a written plan with a rollback step, starting after close and finishing before open. If it is going to run past the window, you get a phone call with the options rather than a surprise at 8am.
Old equipment stays in place until the new network has been tested on live traffic. It only comes out once the replacement is proven.
It depends on the survey. If the existing cabling is Cat5e or better and the runs are short enough, we may only need to reposition access points. If it is older or damaged, new cable usually costs less than a year of repeated complaints.
Yes, and most network cutovers are done that way. A retail unit or a busy office cannot afford to lose trading hours, so we plan the switch for your quiet period.
A single-office Wi-Fi refresh is often two to three days on site. A full recable with new switching runs to one to three weeks, and you get a phased plan with dates before we start.
Some, unavoidably, but we keep it to minutes rather than hours. The work runs out of hours and we test before we switch the office over.
Yes. We supply, configure and document it, but the hardware and the cabling are yours.
Book a free 60-minute health check. We will tell you what you actually need, including when the answer is nothing.